These are almost exactly a year overdue. Taken August 2012, its the belated latest on the "progress" of the construction of the wall being built on the lands of the village of Walaja and beyond.
I'll let the pictures do the talking, posted in reverse chronological order so the green beauty of the hills can stand solidly in our imaginations as the grey concrete grows.
The last post left off showing the hill where preliminary digging had begun. I'll start on that same hill and go from first walk to last.
I'll let the pictures do the talking, posted in reverse chronological order so the green beauty of the hills can stand solidly in our imaginations as the grey concrete grows.
The last post left off showing the hill where preliminary digging had begun. I'll start on that same hill and go from first walk to last.
August 2011, the Walaja hills. The orange marker center left had mapped out where the wall would go. |